Opened 10 years ago

Closed 10 years ago

Last modified 10 years ago

#569 closed new feature (fixed)

volunteer: basic filemanagment, downloadpage, playground integration

Reported by: philipp Owned by: micha
Priority: minor Milestone: 0.6-short - full copy release
Component: unknown Keywords:
Cc: micha, andreas

Description

idea:

  • allow members to upload files (promotion material, code) and edit code (prototypes, drafts, bwrox source code) online in an easy way.
  • allow members to download files and view prototypes, drafts from within BW

simple solution for now:

  • integrate a web filemanager (for now hosted on a different server) that has a syntax highlighting editor
  • integrate browsable web directories

next step:

  • move stuff to bw servers
  • link to bw rox directory to svn and webserver to allow online editing / checking of the changes for everybody (difficult to secure the sever in such a setup)

Change History (6)

comment:1 Changed 10 years ago by philipp

please move r4819,r4818, r4817 to alpha to allow adding of words

does this feature make any sense to you?

comment:2 Changed 10 years ago by micha

  • Owner changed from philipp to micha
  • Status changed from new to assigned

Hi Philipp, sorry for not giving any feedback till now. I will move this to alpha now and want to emphasize that it definitely makes sense! I don't like the whole iframe solution so much but it's more because of the wasted space around it. I will try to deactivate the sidebar for the playground and the filemanager at least, ok?

I could also think of putting the search field in the teaser next to the page-title. otherwise it takes more vertical space. In general it's hard to valorate the page if the wordings are not introduced yet.

comment:3 Changed 10 years ago by micha

moved to alpha in r5076

comment:4 Changed 10 years ago by micha

  • follow_up changed from move to alpha to test on alpha

comment:5 Changed 10 years ago by micha

  • follow_up changed from test on alpha to none
  • Resolution set to fixed
  • Status changed from assigned to closed
  • version changed from test to all

moved to production in r5228

comment:6 Changed 10 years ago by philipp

  • Milestone changed from BeVolunteer GA special release to 0.6-short

Milestone BeVolunteer GA special release deleted

Note: See TracTickets for help on using tickets.